Pipedream Industries

Write the carbon and the strength into the same concrete spec.

Producers stop at 30–40% SCM because a failed pour is their risk. A performance specification gives the producer room to use the materials already in the plant, while the trial batch protects the engineer, schedule and owner's carbon target.

Field performance first

Fig. 1Field pour · 50% slag · strength vs age
02,0004,0006,0008,00010,000Wk 1Wk 2Wk 3Wk 4UNTREATED MIX AT 28 DAYS7,090 PSI≈ 28-day strength at 7 days+2,850 PSI · +40%
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Trident: design strengthUntreated: design strength

1 week instead of 4.

The field mix reached untreated 28-day strength at 7 days and finished 40% higher.
AgeUntreatedTrident
1 d1,220 PSI1,470 PSI
7 d4,350 PSI7,030 PSI
14 d5,540 PSI8,990 PSI
28 d7,090 PSI9,940 PSI
Producer QC lab · ASTM C39 · poured control cast alongside the same mix · breaks Jul 30–Aug 26, 2026.
Fig. 220% cement / 80% slag · strength vs age
02,0004,0006,0008,000Wk 1Wk 2Wk 3Wk 4UNTREATED 80% SLAG AT 28 DAYS5,133 PSIClears at 7 days+1,566 PSI · +31%
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Trident: design strengthUntreated: design strength

Design strength in week 1.

The 80% slag mix clears its untreated 28-day strength at 7 days.
AgeUntreatedTrident
3 d3,118 PSI4,104 PSI
7 d3,596 PSI5,177 PSI
28 d5,133 PSI6,699 PSI
3rd party gov't accredited laboratory · M30 · Trident 1.2 L/m³ (≈31 fl oz/yd³) · Oct 2026.

Choose the lever that serves the project

PriorityWriteExpected outcome
Carbon + speedGWP cap plus early-age strengthDeep SCM replacement without waiting 28 days
Carbon + costGWP cap plus performanceAbout 9–13% lower materials cost at equal strength across 50–80% SCM
Exposure-limitedACI 318 exposure limit plus GWP cap50% slag for F3; deeper replacement elsewhere

Sample clauses

Draft for review with counsel and the engineer of record.

Performance (recommended first)

Concrete shall achieve the specified f′c and shall not exceed [X] kg CO₂e/m³ (A1–A3), demonstrated by EPD and trial batch tested per ASTM C39.

SCM minimum

Concrete shall contain at least [X]% supplementary cementitious material by mass of total cementitious material, subject to exposure-class limits and trial-batch validation.

Schedule

The trial batch shall demonstrate the project release strength at the required age and the specified 28-day compressive strength.

Set the carbon limit from published data

Published M30 series · 380 kg/m³ binder

337

equal-strength standard 80/20

117

target kg CO₂e/m³ · -65%

—

tonnes avoided for volume

Binder model, A1–A3. Published EPD factors: OPC 922, slag 147 and fly ash 10 kg CO₂e/t. Equal-strength baseline: 439 kg/m³ standard 80/20; Trident mixes: 380 kg/m³. Trident adds a Pipedream estimate of 2 kg CO₂e/m³. Estimates, not an EPD.